Buying a new roof in Courtenay
Courtenay is the Comox Valley's regional hub — about 28,000 people at the confluence of the Puntledge and Tsolum rivers, where the valley's water gathers into the Courtenay River estuary before reaching the Strait of Georgia ([en.wikipedia.org/wiki/Courtenay,_British_Columbia](https://en.wikipedia.org/wiki/Courtenay,_British_Columbia)). The city grew on coal, logging, fishing and farming, and the housing stock shows it: character homes near the downtown core, mid-century neighbourhoods across the valley floor, and newer subdivisions pushing south and west. Comox and Cumberland sit inside the same job market, so a "Courtenay" quote may come from a crew based anywhere in the valley — and older places here still carry cedar shake, so shake-to-asphalt conversions are steady work and heavier than a straight shingle swap.
Permits and bylaw rules
The City's [building and plumbing permits page](https://www.courtenay.ca/building-services) states the rule plainly: a building permit is required before you build, demolish, repair or alter most structures, and repair is on the list. Courtenay administers that under [Building Bylaw No. 3114](https://www.courtenay.ca/services/bylaws/find-bylaw/building-bylaw) (consolidated October 2025), which sets out when permits are required and the responsibilities of owners and constructors. Read together, the practical answer for a homeowner is: assume a Courtenay re-roof is a permit job, and confirm the scope with the City's Building division at City Hall, 830 Cliffe Avenue, 250-334-4441 — especially if the crew expects to replace sheathing or touch rafters, because structural discovery mid-job is what turns a simple re-roof into a bigger permit conversation. If your project includes a plumbing element, the plumbing permit folds into the building permit application rather than standing alone.
Rain, moss and the seismic footnote
Climate data from Comox Airport, about seven kilometres away, shows roughly 1,152 mm of precipitation a year — November and December heaviest at about 189 and 194 mm each, July lightest at about 24 mm, with around 51 cm of snow ([en.wikipedia.org/wiki/Courtenay,_British_Columbia](https://en.wikipedia.org/wiki/Courtenay,_British_Columbia)). On a roof that pattern does three things. Moss and lichen colonize shaded north slopes quickly in this valley, so stripping, treating and fixing attic ventilation belongs inside the re-roof, not after it. Months of wind-driven rain off the strait test every valley, skylight and chimney flashing, so the underlayment detail matters as much as the shingle: self-adhering membrane at eaves and valleys is standard practice here. And the seismic footnote is not theoretical in Courtenay: the magnitude-7.3 earthquake of June 1946, with its epicentre at Forbidden Plateau just west of town, destroyed chimneys across the city and damaged the post office and a school — the largest onshore earthquake recorded in Canada ([en.wikipedia.org/wiki/Courtenay,_British_Columbia](https://en.wikipedia.org/wiki/Courtenay,_British_Columbia)). A re-roof is the cheapest moment to ask about chimney condition, roof-to-wall strapping and the roof's tie into the walls.
The season
The dry window runs roughly May through September, with July and August the best weeks, and Comox Valley crews are booked hardest through that stretch. Book a re-roof in late spring for a summer slot; a tear-off that runs into the first November blow is the mistake to avoid, because the roof is open overnight. Fall and winter jobs happen between weather systems, but the quote should then price tarps, overnight protection and weather days.
What drives the price
Quotes move most on slope, storeys and what's under the shingles: two-storey sides and steep pitches add staging and safety setup, older character homes hide failed sheathing under old shakes, and rotten decking discovered mid-job is usually billed extra at a per-sheet rate. Valley-floor lots near the rivers can restrict where a dump trailer or crane sits. On top come material grade (three-tab versus architectural shingles versus metal), flashing and chimney work — real money in a town with a chimney-heavy older stock — skylight replacement, moss treatment and ventilation upgrades. Travel plays in as well, since crews quote differently from Courtenay, Comox, Cumberland or points south. In BC, roofing contractors generally [pay PST on materials they buy for the job](https://www2.gov.bc.ca/gov/content/taxes/sales-taxes/pst/charge-collect/pst-real-property-contractors/contractors-paying-pst). They [do not charge customers PST on roofing services](https://www2.gov.bc.ca/gov/content/taxes/sales-taxes/pst/charge-collect/pst-real-property-contractors/contractors-charging-pst).
What to ask each Courtenay roofing contractor
- Does my re-roof need a building permit under the City's repair-and-alter rule, and who confirms the scope with the Building division at 250-334-4441 before the deposit?
- What happens to the price if you find rotten sheathing under the shakes: what per-sheet rate, and is it in writing?
- What underlayment and membrane detail do you use at the eaves and valleys for wind-driven rain off the strait?
- Given the 1946 earthquake, what can you check or add while the deck is open — chimney flashing condition, roof-to-wall strapping — and what does that cost?
- How do you handle moss on the old roof — treatment, disposal, and protecting the garden and gutters from debris?
- Which parts of the quote cover flashing, chimney and skylight work, and which vents or fans get replaced?
- Can I see your WorkSafeBC clearance letter and liability insurance before the deposit?
- What is the workmanship warranty in years, separate from the manufacturer's material warranty, and who answers the phone if the roof leaks next November?